Systems Modelling and Simulation - Old Page (Before October 2011)

Please use the material in this page responsibly and only for educational purposes.

NOTE: The content of this page has significantly been modified since the Academic Year starting October 2011

for the udated page click (here)

Lecture notes Lab Notes Examples Comments
1
2 L 2

example 6-1

From Chapter 6 of " Introduction to Simulation Modelling and Value Chains"; Course Book
3 L 3 example 8-1*

From Chapter 8: Introduction to Simulation Modelling and Value Chains; Course Book

* NOTE Example 8-1: If you are running example 8-1 using Arena's academic/demo version you realise that a warning/error will pop up after a while declaring that "you have exceeded 150 entities" allowed for the academic/demo version of Arena . This is due to the fact that the model is generating too many entities i.e. exceeding the allowance for the demo version. The reason for this error could be due to the parts waiting behind resources to be processed or too many entities being generated. Do not worry - by changing the time between arrivals or reducing the processing time you can solve this at this stage. Later on you will be using the Balking example to monitor the number of entities behind queues and will be able to troubleshoot this sort of problem.

[This was intentional for you to experience this sort of error in Arena]

However, your individual assignments are designed in a way that you should not have this issue at all. Therefore, if you encounter this error whilst completing your individual assignment; this means that there is a mistake in your model. You need to detect and resolve this mistake in your modelling approach.

4 L 4

example 8-2

example 8-3

From Chapter 8: Introduction to Simulation Modelling and Value Chains; Course Book
5 L5-A example 8-4 From Chapter 8: Introduction to Simulation Modelling and Value Chains; Course Book
   

Queues with limited capacity (the balking examples)

Balking (1)

Balking (2)

Also see Simulation with Arena (4th Edition) Chapter 9 for Balking
    Input Analyser - Example  
  Sequencing Sequencing Example From the book Simulation with Arena (4th Edition) Chapter 7
 

L 5-B

L5-C

Transfer Resource-Constrained,

Transporter 1 , 2

Conveyor

From Simulation with Arena (4th Edition) Chapter 8
6 L6 example 5-1 From: Simulation with Arena (4th Edition) Chapter 5
7 L7

example 5-2

example 5-3

Table 5-2&3

From: Simulation with Arena (4th Edition) Chapter 5
8 L8 Example  
9      
More examples from my students
A&E model   Hold & Signal Model Heathrow Runways Mixed Model
Shirt Manufacturing    

(Examples From Simulation with Arena Kelton et al 2002 and 2003- McGraw-Hill) --- You need Arena 5.0 or later versions to view - Also note that the model numbers here may not necessarily correspond to the model numbers in different editions of the book Simulation with Arena Kelton et al. But all models are from various versions of the books under the specified subjects

Chapter 3
Chapter 4
Chapter 5
Chapter 6
model 3-1.doe
model 4-1, 2, 3

model 5-1 Call Centre

model 5-1 Mechanical Shop

model 6-1, 2 Manufacturing Example
Chapter 7
Chapter 8 & 9 Entity Transfer

model 7-1, 2, 3, 4

Resource Based Transfer

Resource-Based Transfer

Transporters

version 1

version 2

Conveyors

version 1 (no limit buffer)

version 2 (limited buffer)

 

Exercise Solutions ( From Simulation with Arena Kelton et al 2002 - McGraw-Hill) ---- These are examples for some of you who have older versions of Arena.

Chapter 3
Chapter 4
Chapter 5
Chapter 6

model 3-6.doe

model 3-7. doe

model 4-1.doe

model 4-3.doe

model 5-11a, b, c.doe

model 5-14.doe

model 6-8.doe
Assignment:
Assignment and Project submission guidelines
Arena Vista Installation Guide (Link to Systems Navigator)
Arena Windows 7 installation (Link to Systems Navigator)
Rockwell Automation for Arena Software Website
Back